| This was a "sane" pour for a 11x 22 floor pad which we used 12 bodies to do. It is nothing here to see 30-40 guys doing a pour, especially if it is being mixed on the ground in stead of a machine. |
| Everyone has their job, loading the mixer, running the mixture,. running it up a ladder to the roof, dumping and troweling...... and if you live in the neighborhood, chances are you'd be here. |
| This is early in the day......by the end, these guys will be covered in slop from bailing up the ladder. |
| The guy in the blue shirt is Ti-YaYa and he's good at directing this stuff as well as finishing |
String line preset for a level pour. |
| That block pit rarely gets full because these guys have it flying up the ladder. |
| Three pours, $12K, over 1400 square feet......about 900 sq ft more, hopefully done before Christmas! |
| The new ceiling/floor over the main entry......space above for bedrooms! |